Our Safety Features

Our Features

  • Changes in P/up & Drop Schedules are implemented within 48 hours.
  • All Trips will only have one scheduled Pickup & Drop timing.
  • Dynamic up gradation of employee data on leaves/un-scheduled offs absence/ resignation/change of address
  • Implants would certify on starting/closing Kms and Time.
  • Total time of journey from 1st point of pick-up to the Clients office premises.
  • Shortest Distance / Time Analysis.
  • Route-wise traffic flow analysis – alternate route plans.
  • Bottleneck points/delay due to congested access to interior residential points/ Railway crossings.
  • Identify common points of Pick-up during day.

Man power Structure /Roles & Responsibilities

  • Supervisors would be responsible in collecting the staff data with p/up and drop timing
  • Supervisors will prepare and optimized route plan and get it approved from the transport coordinator
  • Supervisors plans the days operation and instructs the Tracker to proceed with the cab movement
  • Supervisor is responsible in submitting the daily and monthly reports to the client
  • The tracker allots the cab according to the route plan and generates the log sheets for p/ups and drops
  • The tracker releases the cabs for p/up well in advance
  • The tracker will continuously interact with the drivers to monitor the cab movement and locations
  • The tracker will prepare the exception report at the end of the day after collecting log sheets from the drivers and submits it to the supervisor.